What a fixed-price contract should include

By [AUTHOR NAME] · 6 min read

A project lead and a couple reviewing printed plans on a workbench inside a framed house

Start with the scope. A good contract lists what is being built room by room, with the drawings and selections it is based on. If a line says “kitchen remodel” and nothing else, the price is a guess and the gaps will show up later as extras.

Allowances

Allowances are where budgets drift. Each one should name the item, the dollar amount and what happens if you go over or under. A tile allowance of $12 a square foot is clear. “Tile allowance: TBD” is not. Ask how the allowance was set, and whether it covers installation or only material.

Exclusions

Every contract leaves some things out. The question is whether it says so. Look for an exclusions list: items such as appliances, landscaping, furniture or window coverings that the price does not include. If you expected something to be in the scope and it is not listed either way, ask now.

Change orders

Change orders should be priced and signed before the work happens, not settled at the end. A good change order lists the cost, the schedule effect and who asked for it. You should be able to say no after seeing the number.

Payment schedule

Payments should follow milestones, not the calendar. A common sample schedule is a small deposit at signing, then payments at framing complete, rough-in complete, drywall complete and final walk. Be wary of large deposits for work that has not started.

Before you sign

Ask for the schedule in writing, and ask who will be on site each day. Check that the license number and insurance certificate match the name on the contract. Then read the warranty section and ask how a claim works in practice. A fixed price is only useful if the document behind it is specific.