Whole-home remodels

Whole-home remodels without the guesswork

Walls, systems and finishes updated in one sequence, so trades do not trip over each other and the house is not torn up twice.

A project lead and a couple reviewing printed plans on a workbench inside a framed house

What is included

Everything in one scope

  • Structural changes with engineered drawings
  • New electrical, plumbing and heating where needed
  • Insulation, air sealing and windows
  • Kitchens, baths and flooring as one schedule
  • Permits, inspections and dust protection
  • Two-coat paint and a full final clean
Two builders on a timber-framed house under construction beside stacked lumber

Typical timeline

How long it usually takes

5 to 8 months depending on scope (sample).

6 to 8 weeks

Design and permits

4 to 8 months

On site

Every Friday

Weekly update

Our process

How it goes

01

Walkthrough

We walk the site or the house with you and talk through goals, budget and timing.

02

Design and selections

Plans, finishes and fixtures get decided on paper, where changes are cheap.

03

Fixed-price proposal

A written scope, price and schedule for whole-home remodels. Allowances and exclusions are spelled out.

04

Build

One project lead on site, an update every Friday and a clean job at the end of each day.

Questions

Whole-home remodels questions

Can we stay in the house during a whole-home remodel?
Sometimes. We plan work in phases and tell you honestly when a move-out window saves time and money.
How do you sequence the work?
Structure and systems first, then insulation and drywall, then finishes. Each phase is on the written schedule.
What if we find surprises behind the walls?
Older houses hide things. We price a contingency line up front and quote any larger finding as a change order before work continues.

Related services

Other ways we can help

All services

Ready to scope this out?

A walkthrough takes about an hour. You leave with a clear idea of scope, budget range and timing.

CallPlan your project