Kitchens and baths

Kitchens and baths that work as hard as they look

Design, cabinetry, plumbing, electrical and tile under one contract, with one project lead.

Kitchen with oak cabinets, a long island with stools and black-framed windows

What is included

Everything in one scope

  • Layout and design with drawings you approve
  • Cabinetry, counters and tile, supplied and installed
  • Plumbing, electrical and ventilation to code
  • Permits, inspections and dust protection
  • Fixtures and appliances set and tested
  • Two-coat paint and a full final clean
Bathroom with a clay-tile glass shower, freestanding tub and round mirror above an oak vanity

Typical timeline

How long it usually takes

6 to 8 weeks for a kitchen, 4 to 6 weeks for a bath (sample).

3 to 4 weeks

Design and selections

4 to 8 weeks

On site

Every Friday

Weekly update

Our process

How it goes

01

Walkthrough

We walk the site or the house with you and talk through goals, budget and timing.

02

Design and selections

Plans, finishes and fixtures get decided on paper, where changes are cheap.

03

Fixed-price proposal

A written scope, price and schedule for kitchens and baths. Allowances and exclusions are spelled out.

04

Build

One project lead on site, an update every Friday and a clean job at the end of each day.

Questions

Kitchens and baths questions

How long does a kitchen remodel take?
Most kitchens take six to eight weeks once work starts. Design, selections and permits come first, and you get a written schedule before demolition.
Do you give fixed prices?
Yes. After design and selections you get a fixed price with every allowance listed. It changes only if you sign a change order.
Can we live in the house during a remodel?
Usually, yes. We set up a temporary kitchen, seal off the work area and keep one bathroom working.
Who will be on site each day?
One project lead from first walkthrough to final walk. Trade crews rotate as the schedule needs them.

Related services

Other ways we can help

All services

Ready to scope this out?

A walkthrough takes about an hour. You leave with a clear idea of scope, budget range and timing.

CallPlan your project