Custom homes and remodels · [REGION]

Built to the plan. Finished on the date.

Ridgeline builds custom homes, remodels and additions in [REGION]. Fixed scope, a written schedule and one project lead from first walk to final punch list.

Two-story white farmhouse with a dark metal roof and lit windows at dusk

24

Years building in [REGION]

380

Homes and remodels completed

96%

Projects finished on schedule

10

Year workmanship warranty

What we build

One builder for the whole job

From a single room to a ground-up home, the same crew leads and the same standards apply.

All services

How it works

Six steps, all of them in writing

01

Walkthrough

We walk the site or the house with you and talk through goals, budget and timing.

02

Design and selections

Plans, finishes and fixtures get decided on paper, where changes are cheap.

03

Fixed-price proposal

A written scope, price and schedule. Allowances and exclusions are spelled out.

04

Permits and prep

We pull permits, order long-lead materials and protect the rooms we are not touching.

05

Build

One project lead on site, an update every Friday and a clean job at the end of each day.

06

Final walk and warranty

We walk the finished work together, close the punch list and stay on call through the warranty.

A project lead and a couple reviewing printed plans on a workbench inside a framed house

Why Ridgeline

You always know where the job stands

  • Written scope and fixed price before work starts
  • One project lead on site, start to finish
  • An update every Friday: done, next, decisions needed
  • Licensed, bonded and insured in [STATE]

Reviews

What clients say after the dust settles

Sample reviews, shown to illustrate the layout.

Read all reviews
They told us the schedule on day one and kept it. The weekly updates meant we never had to chase an answer.
Sample clientSample review · Whole-home remodel
The price in the proposal was the price we paid. The two changes we asked for were quoted before any work happened.
Sample clientSample review · Kitchen remodel
Our project lead was on site every morning. Subs showed up when he said they would.
Sample clientSample review · Custom home

Questions

Asked before most projects

More questions
How long does a kitchen remodel take?
Most kitchens take six to eight weeks once work starts. Design, selections and permits come first, and you get a written schedule before demolition.
Do you give fixed prices?
Yes. After design and selections you get a fixed price with every allowance listed. It changes only if you sign a change order.
Can we live in the house during a remodel?
Usually, yes. We seal off the work area, protect floors and keep one working bathroom. For whole-home projects we plan a move-out window together before demolition.
Who will be on site each day?
One project lead, the same person from the first walkthrough to the final walk. Trade crews rotate as the schedule calls for them, and the lead is there to meet them.
Do you work with our architect or designer?
Yes. We price the drawings early, flag cost and constructability questions, and build to the plans as issued. If you have no designer, we can bring one in.

Journal

Notes from the job site

All posts

Have plans, or just an idea?

Tell us what you want to build. We reply within two business days with next steps and an honest read on budget.

CallPlan your project